Consumer unit upgrade and EICR for a landlord
An unsatisfactory EICR on a two-bedroom colliery terrace, put right between tenancies with a new consumer unit and documented remedial work.
Services
Ten services, one standard of work. Every job is tested, certified and explained.
All servicesDomestic · Full rewire
A full rewire of a four-bedroom Victorian house, with original plasterwork and floors kept intact and the family living at home throughout.
The owners had bought the house to restore it. A pre-purchase EICR was unsatisfactory: much of the wiring was original rubber-insulated cable, there was no earth to the lighting circuits, and a 1970s fuse board sat under the stairs. They wanted the electrics done once and properly before any decorating started, and they needed to stay in the house with two children.
The ground floor has deep plaster cornices, two ceiling roses and original pitch-pine floorboards, all of which the owners wanted to keep. The first floor was due to be replastered anyway, but the ground floor walls were not. Every cable route downstairs had to reach its point without cutting into the cornice or chasing the good plaster.
A temporary supply kept the kitchen, fridge and one bedroom running throughout first fix. Work areas were closed off with dust sheets and zipped screens, and floors were protected from the front door upward. Every evening, the rooms that had been worked in were made safe, with no exposed cable ends, and the family had lighting and power in the rooms they were using.
The house now has a fully certified installation with every circuit individually protected, and the original cornices, ceiling roses and floors are intact. The owners received the Electrical Installation Certificate, the building control notification and a labelled circuit chart, and started decorating the following week.
An illustrative case study for this website concept. Photographs are generated imagery made for the concept, not a record of a real job.
An unsatisfactory EICR on a two-bedroom colliery terrace, put right between tenancies with a new consumer unit and documented remedial work.
A smart home charger, outdoor power and a restrained garden lighting scheme, installed as one planned job rather than three separate ones.
Send the quote form with a photo if it helps, or call and talk it through. You will get a straight answer and a written price.