Arc & AnchorElectrical, home page Call the electrician0191 498 0374 Request a quote

Domestic · Full rewire

Full rewire of a Victorian end-terrace

A full rewire of a four-bedroom Victorian house, with original plasterwork and floors kept intact and the family living at home throughout.

A large Victorian end-of-terrace house in Sunderland with a two-storey bay window, sandstone lintels and a dark front door
Property
Four-bedroom Victorian end-terrace
Scope
Full rewire, new consumer unit, interlinked alarms
Programme
First fix, plastering, then second fix
Certification
Electrical Installation Certificate, notified to building control
Location
Ashbrooke, Sunderland

01The requirement

The owners had bought the house to restore it. A pre-purchase EICR was unsatisfactory: much of the wiring was original rubber-insulated cable, there was no earth to the lighting circuits, and a 1970s fuse board sat under the stairs. They wanted the electrics done once and properly before any decorating started, and they needed to stay in the house with two children.

02The condition and the constraint

The ground floor has deep plaster cornices, two ceiling roses and original pitch-pine floorboards, all of which the owners wanted to keep. The first floor was due to be replastered anyway, but the ground floor walls were not. Every cable route downstairs had to reach its point without cutting into the cornice or chasing the good plaster.

03The work completed

  • A survey and a room-by-room specification agreed with the owners, marking every socket, switch and light position on site
  • Ground-floor circuits run from beneath, through the cellar and up behind skirting boards, with floorboards lifted, numbered and relaid in their original positions
  • First-floor circuits chased into walls ahead of the planned replastering
  • Ceiling roses kept, with new pendant supply cables fed through from above without disturbing the plasterwork
  • A new metal-clad consumer unit with RCBO protection and surge protection
  • Mains-wired, interlinked smoke and heat alarms throughout, plus a new supply ready for a future EV charger

04Safety and disruption

A temporary supply kept the kitchen, fridge and one bedroom running throughout first fix. Work areas were closed off with dust sheets and zipped screens, and floors were protected from the front door upward. Every evening, the rooms that had been worked in were made safe, with no exposed cable ends, and the family had lighting and power in the rooms they were using.

05The result

The house now has a fully certified installation with every circuit individually protected, and the original cornices, ceiling roses and floors are intact. The owners received the Electrical Installation Certificate, the building control notification and a labelled circuit chart, and started decorating the following week.

Project gallery

Photographs from the job.

An illustrative case study for this website concept. Photographs are generated imagery made for the concept, not a record of a real job.

More projects

Other recent work.

Planning something similar?

Send the quote form with a photo if it helps, or call and talk it through. You will get a straight answer and a written price.

Call Request a quote